Resource
EDM-200 Instruction Manual, Rev R, English
This instruction manual provides information for the installation, calibration, operation, and maintenance of the EDM-200 Exciter Diode Monitor, including exciter diode fault detection, alarm annunciation, system monitoring, troubleshooting, and technical specifications.
Resource
Application Note: PC-INTERTIE
This application note provides a step-by-step guide for implementing an Inertie Protection scheme using BESTCOMSPlus®, BESTspace™, and preprogrammed logic files with the BE1-11 relay. It explains configuration, setup procedures, and protection logic for inverter-based resources, including directional overcurrent, voltage, frequency, and rate-of-change-of-frequency protection functions.
Resource
Easy Conversion Chart: BE1-IPS100 to BE1-11i (XLSX)
This conversion chart provides a cross-reference for replacing legacy BE1-IPS100 Intertie Protection Systems with the BE1-11i Intertie Protection System, showing how to translate BE1-IPS100 style configuration options into equivalent BE1-11i model and option selections for intertie protection, utility interconnection, and distributed generation upgrade applications.
Resource
Easy Conversion Chart: BE1-IPS100 to BE1-11i (PDF)
This conversion chart provides a cross-reference for replacing legacy BE1-IPS100 Intertie Protection Systems with the BE1-11i Intertie Protection System, showing how to translate BE1-IPS100 style configuration options into equivalent BE1-11i model and option selections for intertie protection, utility interconnection, and distributed generation upgrade applications.
Resource
Logic Scheme: Intertie Logic (BE1-11)
This compressed file includes an application note, BESTspace™ file, printable screenshots, and logic file that demonstrate intertie breaker control using the BE1-11, providing configuration examples and implementation guidance for interconnection, synchronization, protection, and power system control applications.
Resource
Technical Paper: Green Power – Wind Generated Protection and Control Considerations
Green power projects like wind farms allow protection and control engineers to use modern technology to provide cost effective systems.
Resource
CBS 212A Bulletin, Rev 11, English
This product bulletin provides an overview of the features, benefits, specifications, and configuration options of the CBS 212 Current Boost System.
Resource
CBS 320 Instruction Manual, Rev G, English
This instruction manual provides comprehensive information for the installation, operation, testing, and application of the CBS 305 Current Boost Module and associated current transformers, including mounting, interconnections, CT turns-ratio selection, and installation verification procedures.